Vernon Gondola Site Development

Our scope at the Vernon destination site included access-road rehabilitation, grading and controlled rock work.

Project information

A closer look at our work.

As prime contractor, we prepared access and groundworks for the gondola development in Vernon's mountain terrain.

Our role
Prime contractor
About 4,883 m²road surface
About 2,300 m³rock blasting and earthworks

Our scope

  • Rehabilitated access roads and prepared asphalt surfaces.
  • Completed controlled blasting and excavation for foundations and site development.
  • Graded the base and summit areas and prepared parking and drainage works.