We renewed water and sanitary infrastructure east of Main Street and restored the road surface in a constrained village corridor.

Client
Village of Lytton
Project year
2025
About 500 m150 mm watermain
About 150 m150 mm sanitary sewer
About 870 m²road restoration

Our scope

  • Installed new watermain and sanitary sewer with service tie-ins.
  • Verified existing underground conditions where older records did not fully reflect the field layout.
  • Installed a geoliner within the utility work.
  • Reconstructed and restored the road above the completed services.