← Back to projects

Project work

01 / 03

Sumac Road Erosion Repairs

Our roadside work addressed erosion repair and stabilization in a challenging setting.

Project information

A closer look at our work.

As prime contractor, we repaired an eroded road embankment and restored the roadway at Sumac Road.

Client
Ministry of Transportation and Transit
Our role
Prime contractor

Our scope

  • Stabilized the riverbank and embankment with engineered riprap, geosynthetics and large woody debris.
  • Rebuilt road base, subbase and asphalt and installed culverts and concrete barriers.
  • Revegetated disturbed areas and incorporated habitat measures.
  • Coordinated in-stream isolation and environmental monitoring, including bird-nesting considerations.

Start a conversation

Ready to break ground on your next project?

Get in touch