South Basin Drainage Improvements

Our stormwater work required horizontal drilling through bedrock and surface restoration.

Project information

A closer look at our work.

As prime contractor, we installed new stormwater infrastructure in Vernon, including a drilled section through bedrock.

Client
City of Vernon
Our role
Prime contractor
About 150 m600 mm HDPE directional drilling
About 350 mFrench drains
About 160 mPVC storm pipe

Our scope

  • Installed a storm main by horizontal directional drilling through bedrock.
  • Installed French drains, storm pipe, manholes and drainage structures.
  • Removed rock and restored affected landscape and streetscape areas.